⌕ Cari QC inspection, lot, batch, produk...
🔔 💬 ❔ Admin Quality Control
Quality Control Dashboard
Monitoring kualitas bahan baku, proses produksi, hasil firing, produk jadi, defect, dan release produk keramik.
Inspeksi Hari Ini126 Lot↑ 8,4% vs kemarin
First Pass Yield96,2%Target ≥ 95%
Pass / Release113 Lot89,7% inspection
Hold8 LotPerlu disposition
Reject5 Lot4,0% dari inspeksi
Defect Rate2,7%↓ 0,4% vs minggu lalu
Monitoring Quality Inspection
QC Incoming • In Process • Final| Inspection | Produk / Lot | Tahap | Parameter | Actual | Spec | Result | Status |
|---|---|---|---|---|---|---|---|
| QC-260818-001 08:15 • Inspector: AR |
Granite Tile 60x60 LOT-GR-0818-21 • PO-260815-021 |
Final | Water Absorption | 0,38% | ≤ 0,50% | PASS | RELEASE |
| QC-260818-002 09:05 • Inspector: DS |
Floor Tile 40x40 LOT-FL-0818-08 • PO-260816-008 |
Final | Dimension | 399,8 mm | 399,5–400,5 | PASS | RELEASE |
| QC-260818-003 09:40 • Inspector: AR |
Wall Tile 30x60 LOT-WT-0818-14 • PO-260817-014 |
In Process | Glaze Thickness | 0,72 mm | 0,50–0,70 | OUT SPEC | HOLD |
| QC-260818-004 10:20 • Inspector: FN |
Granite Tile 80x80 LOT-GR-0818-04 • PO-260818-004 |
Final | Flatness | 0,42 mm | ≤ 0,50 mm | PASS | RELEASE |
| QC-260818-005 11:15 • Inspector: DS |
Floor Tile 50x50 LOT-FL-0818-31 • PO-260814-031 |
Final | Surface Defect | 3,4% | ≤ 2,0% | FAIL | REJECT |
| QC-260818-006 12:05 • Inspector: AR |
Frit / Glaze Material LOT-FR-0818-07 • RM-260818-77 |
Incoming | Viscosity | 42 s | 40–45 s | PASS | RELEASE |
QC Trend — 7 Hari
Pass Rate %12131415161718
QC Process Status
Hari ini Incoming QC28 Lot
In Process QC41 Lot
Final Inspection57 Lot
Hold / Disposition8 Lot
Reject5 Lot
© 2026 Ceramic ERP Solution • Quality Control Dashboard Mockup • Untuk Presentasi